In our testing, we found that the pickup’s massive 212.7-kWh battery pack costs a pretty penny to recharge at a DC fast-charging station.
source: Latest Content – Car and Driver
In our testing, we found that the pickup’s massive 212.7-kWh battery pack costs a pretty penny to recharge at a DC fast-charging station.
source: Latest Content – Car and Driver